I'm a mechanical engineering graduate of Cornell University interested in full time aerospace and mechanical engineering opportunities. I have experience in aerospace systems development including mission conception, system design, analysis, testing, integration, fabrication, and verification. My experience also includes proficiency in MATLAB, Python, ANSYS FEA, LabView, Solidworks, and Autodesk software packages as well as 7 years of experience fabricating components in a machine shop. I previously worked on research and development of electric propulsion systems at The Aerospace Corporation. I'm also a mechanical subteam member of the Cornell Lunar CubeSat research project as part of the NASA CubeQuest Challenge. As a drive systems member of Cornell Mars Rover I competed yearly in the University Rover Challenge developing a semi autonomous rover for exploration at the Mars Desert Research Station, Utah.
Working as a propulsion sciences intern, I researched magnetic field topology of ion thrusters in addition to designing, testing, and analyzing a magnetically levitated thrust stand for sensitive thrust measurements under large thermal loads. Conventional thrust stands struggle to record the low thrust (~100mN) of electric propulsion systems without thermal noise from high temperature plasma distorting results. During mag-lev thrust stand tests, I used my MATLAB, LabView, and electronics skills to amplify sensor data while increasing PID control accuracy. I had also the opportunity to work on experimental design and testing utilizing a robot arm, gauss meter, sensor suite, and DAQ system to create 3D magnetic field topologies with feature recognition through MATLAB scripts.
The use of water as a propellant allows for refueling on multiple planets and moons without any chemical processing while the spring deployers provide passive spin stabilization. As a member of the mechanical subteam, I've worked on the design, analysis, optimization, testing, and integration of several key systems including the propulsion, structures, and attitude control system. We've recently won first place in the NASA CubeQuest ground tournament and have secured a spot on the first SLS/Orion exploratory mission. Using ANSYS/Fluent I analyzed structural components under significant load cases: launch deployment, thruster firings, and thermal cycling events. Through ANSYS goal driven optimization, I reduced the mass of multiple components while increasing factor of safety under load conditions. I manufactured components inhouse using Cornell's machine shop to develop a testing prototype after designing components in Solidworks CAD. MATLAB scripts utilizing a force sensor DAQ system and thermal vacuum chamber recorded thrust precision and peak magnitude in a vacuum environment filtering out noise and drift.
Competing every year in the University Rover Challenge in the Utah Desert, the Cornell Mars Rover team designs, builds, and tests a new rover each year capable of analyzing soil samples for life, using a robotic arm to assist astronauts, and traversing over harsh terrain. As the mechanical drive system engineer, I worked on the Rocker-Bogie suspension system inspired by the Curiosity rover as well as the rear suspension system. I also oversaw all phases of the project from design review to competition testing. The first half of the year, I model mechanical components in Solidworks CAD and analyze structural, dynamic, and thermal properties in MATLAB and ANSYS FEA. The other half I machine all parts ourselves in house using lathes, mills, and 3D printing techniques. After assembly, the rover goes through a rigorous integration and testing schedule meant to emulate Martian environmental conditions and complete astronaut assistance tasks such as analyzing soil samples and repairing outposts. a vacuum environment filtering out noise and drift.